Normal Change Request


What is a Normal Change?

A Normal Change is a change that is not an emergency change or a standard change. Normal changes follow the defined steps of the change management process. These changes require a full range of assessments and authorizations such as peer or technical approval, change management, and Change Advisory Board (CAB) authorization, to ensure completeness, accuracy, and the least possible disruption to service. These changes are most often scheduled outside of defined change blackout windows or during defined maintenance windows.

A Change Request includes the time to complete the task AND the time for functional testing by stakeholders to validate the change's success.  Timely functional testing reduces risk and impact from possible rollbacks.

 

Normal Change Data Flow

 

How to Create a New Normal Change 

VIDEO GUIDE
A video guide to this process is below the step-by-step instructions.

 

  1. Navigate to the Service Operations Workspace (SOW) in Service Now, follow URL:
    Home | Service Operations Workspace | ServiceNow
  2. Click on the + (Plus) sign next to home tab and select 'New Change Request'
  3. Click on the Normal Card/Tile to start a new Normal Change Request
  4. Click on Continue option located on the top right corner of the page.
    notebook-pen-iconNote: Continue button does not get enabled until a card is chosen.
  5. Complete all the required fields for Normal Change Request, click on the Save button
    located at the top right corner of this page.
  6. Stay on the same form and scroll down to locate the Assignment section>Click on the Assign button
    • Choose an Assignment group name
    • Enter the desired username in Assigned To field
    • Enter Work notes (optional)
    • Click on Save
  7. From the Normal Change Overview Page, click on 'Set Schedule' button located in the Schedule section.
    • Schedule button opens a new tab for the conflict calendar.
    • Enter your planned Start Date Time and Planned End Date Time for this emergency change.
    • Click the Schedule button to run the conflict calendar.
  8. When the conflict calendar runs, you will see blackout and maintenance window schedules along with other changes that may conflict with your planned start and end dates.
    notebook-pen-icon Note: If you choose a date coincides with a conflicting timeframe, the conflict                            calendar will suggest the next available window and allow you to schedule                      that time instead or continue with your originally selected dates and times.

    Select your Planned start date and Planned end date then **click** the Schedule button to run the conflict calendar 
  9. Click on the Details tab to return to the change request page.
    (Note: You will need to return to the details view to submit your request)
    Once you review the conflict calendar and have your set Planned start and end dates, **click** the Details tab to return to the change process. 

Click on the 'Request Approval' button to start the approval process.
**Click** the Request Approval button in the top right corner of the workspace 

 notebook-pen-iconNOTE: There are two (2) approvals that will occur after you request approval.

    1. First Approval: Manager of the Assigned To
    2. Second Approval: CAB Approval (during the normal Wednesday CAB Meeting)

     The next step continues after these approvals.

Post -Approval Implementation

  1. Navigate to the Normal Change Request either from your email notification or from Service Operations Workspace (SOW), click on 'Implement' button when you are ready to implement the change.
    **Click** the Implement button in the top right corner of the workspace 

  2. Click on the 'Closure Information' button after your change implementation is complete.
    When your change is complete **click** the Add Closure Information button on the Overview page 

  3. Choose a close code (from the list of available codes) and enter any close notes. Click on Close button located in the top right corner of the workspace.



Your Normal Change is now successfully closed.

Video Resources

NOTE: Although all the required fields are the same, the layout of the tabs in this video do not align with the current version.

 

Related Articles

Change Management Overview Standard Change Request Emergency Change Request How to Cancel a Change